28/9/2011- SITE VISIT AND SITE MEASUREMENT
30/10/2011- CONSTRUCTION OF ROOF SLAB AND WET KITCHEN
8/11/11-TILING WORKS
30/11/11-INSTALLATION OF LOUVERS SCREEN
5/12/11-DESIGN PROPOSAL FOR DRY AND WET KITCHEN CABINET
20/12/2011-INSTALLATION OF GRILL, RAILING AND BUILT-IN CABINET