skip to main
|
skip to sidebar
Home
Home
About Us
»
Introduction
Message From Director/Designer
Market Prospects
What Is Architecture?
Projects
»
Completed Projects
»
2009
»
Bungalow House, Ampang
Terrace House, Jalan Ipoh, K.L
2010
»
Taman Dagang Terrace House
Interior Fit-out works for Sekolah Menengah Sains Banting, Selangor
2011
»
Riana Ukay Terrace House
Riana Ukay Terrace House No.1 (sun louvers)
2012
»
Taman Seputeh Teacher's Quaters
Taman Bukit Mewah Flat, Kajang
Office Glass Partition Renovation, Ampang
Wangsa Maju, Seksyen 2 Flat
2013
»
Sales Gallery, Ampang
Double Storey House, Taman Melawati
Double Storey Bulding With Garage And Games Room, Ampang
Duplex Condo, Penang
2014
»
Apartment, Taman Setiawangsa
Apartment,Taman Setiawangsa 2nd Unit
Double Storey House,Bandar Baru Bangi Seksyen 7
Apartment,Villa Wangsamas
Terrace House,Taman Melawati
2015
»
Duplex Apartment, Taman Setiawangsa
2016
»
Double Storey House, Setia Ecohill Semenyih House No. 1
Double Storey House, Setia Ecohill Semenyih House No. 2
2017
»
Mock Up Apartment unit at Putrajaya
2018
»
Bandar Baru Bangi Seksyen 7 Extension
.
On going Projects
»
..
Conceptual Proposals
»
Commercial
»
PERSADA PUTRA MIX DEVELOPMENT
MSU SHAH ALAM BOOKSTORE
CORPORATE OFFICE FACADE PRPOPOSAL,KL
PERNAMA UPGRADING WORKS AT SUBANG,KL
PROPOSED EARLY CHILDHOOD CENTRE AT UNIVERSITY SELANGOR (UNISEL)
Residential
»
TERRACE HOUSE,BANGI
CUL DE SAC TYPE TERRACE HOUSE,MELAWATI
APARTMENT, BATU CAVES
BUNGALOW, BANGSAR
TERRACE HOUSE, DAMANSARA KIM, SELANGOR
.
Designer's Selection
»
Sofa+Chair
Table
Bedframe
Lightings
Toilet Fittings
Designer's Tip
»
Architecture
Interior
Authority
»
DBKL
MPAJ
MBPJ
MPSJ
MBSA
MPKJ
Contact Us
Be Our Fan
http://www.online-casinos-winner.com/
PROPOSED DEMOLITION AND ALTERATION WORKS ON A TWO STOREY TERRACE HOUSE AT TAMAN MELAWATI
07:06
nurizwan_nurikhsan
19/12/2013-SITE MEASUREMENT AND ANALYSIS
Existing Front Elevation
Carporch Area
Main Entrance
Main Entrance overlooking living room and entrance to kitchen
Sliding door overlooking yard area
Rear Elevation View
First Floor Area
25/12/2014-PROPOSED LAYOUT AND SPATIAL STUDY
2/1/2014-DEMOLITION WORKS ON GROUND AND FIRST FLOOR
22/1/2014-SETTING OUT FOR PAD FOOTING AND GROUND BEAM
3/2/2014-GROUND FLOOR COLUMN AND FIRST FLOOR R.C SLAB AND STRUCTURE
12/2/2014-R.C ROOF BEAM AND R.C FLAT ROOF STRUCTURE
18/2/2014-ROOF STRUCTURE, LAYING ROOF TILES, BRICKWORKS AND PLASTERING
24/2/2014-BRICK LAYING, PLASTERING AND CONSTRUCTION OF NEW R.C STAIRCASE
28/2/2014-CONSTRUCTION OF FRONT FACADE
05/03/2014-OUTER FRAME WINDOW INSTALLATION, PLASTERING AND FLOOR RENDERING WORKS
19/3/2014-PLASTER CEILING WORKS AND ELECTRICAL SETTING OUT FOR DOWNLIGHTS
ADDITIONAL STRUCTURE WORKS FOR SKYLIGHT
3/4/2014-TILING WORKS AND FIRST FLOOR RENDER TO RECEIVE NEW FLOOR BOARD