1/10/2012-SITE VISIT AND MEASUREMENT
10/12/2012-STRUCTURE FABRICATIONS AND CONCRETING
20/1/2013-NEW ROOFING INSTALLATION, ALLUMINIUM POWDER COATED WINDOW INSTALLATION,
23/3/2013-UNDERCOAT PAINTING FOR EXTERIOR AND INTERIOR WALL, INSTALLATION OF LAMINATED FLOOR BOARD
VISUAL EXTERIOR PERSPECTIVE AND FACADE COLOUR SCHEME STUDY